Station · Zombie limit
PR Machine III
Third PR Machine tier, upgraded in place. It keeps the lower campaigns and adds +30 zombie limit for 3 weeks, loaded with 20 silver or gold Newspapers and 5 Charged hypno-devices.
- Build cost
- 6× Wooden beam, 8× Advanced Detail
- Previous tier
- PR Machine II
- Next tier
- PR Machine IV
- Loading day
- Gluttony
- Upgrade cost
- 6× Wooden Joint, 8× Steel Detail
Campaigns
| Effect | Load | Time (ticks) |
|---|---|---|
| +10 zombie limit for 1 week | 2× Charged hypno-device | 3 |
| +20 zombie limit for 2 weeks | 10× Newspaper, 3× Charged hypno-device | 8 |
| +30 zombie limit for 3 weeks | 20× Newspaper, 5× Charged hypno-device | 11 |
Good to know
- Upgraded in place from the previous tier on Gluttony.
- Upgrades need materials only, no technology, and are done on Gluttony.
- Campaigns end at the end of Wrath.